Client
Dilemma:
The
client was experiencing a drastic reduction in
sales due to the superior freight car suspension
system of the competitors. In order to reclaim
market share, the client needed a lower weight
and lower costing system.
|
|

|
PTI
Involvement:
The client teamed with PTI to lead the new product
development project. In order to increase the
client's profitability, PTI optimized the design,
reduced the overall cost, and decreased the required
manufacturing time.
|
PTI
Solution:
PTI completely redesigned the structural components
using 3D modeling, structural analysis and process
simulation. PTI also certified the new design
with complete laboratory testing.
|
 |
Client
Delivery:
Along with reducing the overall weight of the suspension
system by 27%, PTI reduced the manufacturing cost
by 25%. Fatigue life and appearance of the system
were also improved. Tooling and prototypes for the
system were ready in half the time of previously
client-driven product development projects. |