Client
Dilemma:
The
brake system on an airport people mover had failed.
The original equipment supplier could not provide
the necessary replacement parts for nine months,
while the client had to return the people mover
to service in less than eight weeks.
|
|

|
PTI
Involvement:
The client called on PTI to assess the system,
determine the failure areas, redesign the components
and provide the finished parts for the brake system.
|
PTI
Solution:
PTI reverse engineered the failed units, conducted
a failure analysis and upgraded the material.
PTI replaced the failed components with fully
machined, assembled and tested units to the client.
|
 |
Client
Delivery:
The people mover was returned to service in less
than six weeks. The client also saved 40% on the
cost of the replacement components by teaming with
PTI instead of the original equipment supplier. |