Client Dilemma:
The feed water pump on a boiler had failed. The original equipment supplier could not provide the replacement parts for thirteen months, while the client needed the parts in less than four months.

 

PTI Involvement:
The client called PTI to assess the pump, determine the failure areas, redesign the components and provide replacement parts for the boiler.

 

PTI Solution:
After reverse engineering the failed housing, PTI produced a computer based 3D model and a LOM prototype for rapid tooling. PTI replaced the failed housing by providing cast, machined and assembled units to the client.

 

Client Delivery:
A new 1400 lb. stainless steel housing was tested and installed. The plant returned to service in less than fourteen weeks. Had the client ordered from the original equipment supplier, the plant would have been down for over a year.